{"id":4303,"date":"2021-05-13T08:30:19","date_gmt":"2021-05-13T08:30:19","guid":{"rendered":"https:\/\/www.skela.ro\/ro\/?p=4303"},"modified":"2024-10-18T11:37:38","modified_gmt":"2024-10-18T11:37:38","slug":"en-structural-steel-apron-for-moldovei-a7-highway","status":"publish","type":"post","link":"https:\/\/www.skela.ro\/en\/structural-steel-apron-for-moldovei-a7-highway\/","title":{"rendered":"Structural Steel &#8211; apron for Moldovei A7 Highway"},"content":{"rendered":"<!-- \/wp:paragraph -->\n\n<!-- wp:heading {\"level\":1} -->\n<h1>Metal deck structure for infrastructure bridge<\/h1>\n<!-- \/wp:heading -->\n\n<!-- wp:preformatted -->\n<p class=\"wp-block-preformatted\"><strong>Skela Industries<\/strong> produced and delivered the metal structure of the road infrastructure bridge deck over the Letea escape channel (Rusi Ciutea). This road infrastructure bridge with mixed deck is part of the Bacau Beltway (bypass of the city), which is part of the <strong>A7 Moldova Highway<\/strong> (Ploiesti &#8211; Bacau &#8211; Pascani &#8211; Suceava &#8211; Siret) &#8211; part of the Pan-European Corridor IX.<\/p>\n<!-- \/wp:preformatted -->\n\n<!-- wp:image {\"id\":4011,\"sizeSlug\":\"large\"} -->\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" class=\"wp-image-4011\" src=\"https:\/\/www.skela.ro\/wp-content\/uploads\/2020\/10\/Pod-metalic-infrastructura-Centura-Bacau-Skela-4-wm-1-1024x683.jpg\" alt=\"Skela Industries - structura metalica pod rutier Centura Bacau A7 - Autostrada Moldovei\" srcset=\"https:\/\/www.skela.ro\/wp-content\/uploads\/2020\/10\/Pod-metalic-infrastructura-Centura-Bacau-Skela-4-wm-1-1024x683.jpg 1024w, https:\/\/www.skela.ro\/wp-content\/uploads\/2020\/10\/Pod-metalic-infrastructura-Centura-Bacau-Skela-4-wm-1-300x200.jpg 300w, https:\/\/www.skela.ro\/wp-content\/uploads\/2020\/10\/Pod-metalic-infrastructura-Centura-Bacau-Skela-4-wm-1-768x512.jpg 768w, https:\/\/www.skela.ro\/wp-content\/uploads\/2020\/10\/Pod-metalic-infrastructura-Centura-Bacau-Skela-4-wm-1.jpg 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption>Metal deck structure for infrastructure (highway) bridge &#8211; Letea Channel, A7 Hghway, Romania<\/figcaption><\/figure>\n<!-- \/wp:image -->\n\n<!-- wp:paragraph -->\n\nFinal beneficiary of the investment &#8211; C.N.A.I.R. S.A.; the works on the road section of approx. 31 km (of which about 16 km highway, which also includes this road bridge), are executed by the association UMB Spedition &#8211; Tenhostrade.\n\n<!-- \/wp:paragraph -->\n\n<!-- wp:heading -->\n<h2>Semi-cassette metal deck highway bridge<\/h2>\n<!-- \/wp:heading -->\n\n<!-- wp:paragraph -->\n\nSkela Industries fabricated the metal structure for the deck of the road bridge. We are talking, at this highway bridge, about a mixed deck (steel + reinforced concrete), composed, in section, of two metal half-boxes, which work together through a reinforced concrete slab.\n\n<!-- \/wp:paragraph -->\n\n<!-- wp:image {\"id\":4015,\"sizeSlug\":\"large\"} -->\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" class=\"wp-image-4015\" src=\"https:\/\/www.skela.ro\/wp-content\/uploads\/2020\/10\/Pod-metalic-infrastructura-Centura-Bacau-Skela-1-wm-1024x683.jpg\" alt=\"Fabrica Skela Industries - productie structura metalica tablier pod rutier Centura Bacau A7 (Autostrada Moldovei)\" srcset=\"https:\/\/www.skela.ro\/wp-content\/uploads\/2020\/10\/Pod-metalic-infrastructura-Centura-Bacau-Skela-1-wm-1024x683.jpg 1024w, https:\/\/www.skela.ro\/wp-content\/uploads\/2020\/10\/Pod-metalic-infrastructura-Centura-Bacau-Skela-1-wm-300x200.jpg 300w, https:\/\/www.skela.ro\/wp-content\/uploads\/2020\/10\/Pod-metalic-infrastructura-Centura-Bacau-Skela-1-wm-768x512.jpg 768w, https:\/\/www.skela.ro\/wp-content\/uploads\/2020\/10\/Pod-metalic-infrastructura-Centura-Bacau-Skela-1-wm.jpg 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/>\n\n<figcaption>Structural steel welding and fabrication &#8211; motorway bridge apron<\/figcaption><\/figure>\n<!-- \/wp:image -->\n\n<!-- wp:image {\"id\":4031,\"sizeSlug\":\"large\"} -->\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" class=\"wp-image-4031\" src=\"https:\/\/www.skela.ro\/wp-content\/uploads\/2020\/10\/Pod-metalic-infrastructura-Centura-Bacau-Skela-5-wm-1024x683.jpg\" alt=\"Fabrica Skela Industries - productie caseta metalica tablier pod rutier Centura Bacau A7 (Autostrada Moldovei)\" srcset=\"https:\/\/www.skela.ro\/wp-content\/uploads\/2020\/10\/Pod-metalic-infrastructura-Centura-Bacau-Skela-5-wm-1024x683.jpg 1024w, https:\/\/www.skela.ro\/wp-content\/uploads\/2020\/10\/Pod-metalic-infrastructura-Centura-Bacau-Skela-5-wm-300x200.jpg 300w, https:\/\/www.skela.ro\/wp-content\/uploads\/2020\/10\/Pod-metalic-infrastructura-Centura-Bacau-Skela-5-wm-768x512.jpg 768w, https:\/\/www.skela.ro\/wp-content\/uploads\/2020\/10\/Pod-metalic-infrastructura-Centura-Bacau-Skela-5-wm.jpg 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/>\n\n<figcaption>Structural steel fabrication &#8211; infrastructure bridge deck<\/figcaption><\/figure>\n<!-- \/wp:image -->\n\n<!-- wp:paragraph -->\n<p id=\"tw-target-text\" class=\"tw-data-text tw-text-large XcVN5d tw-ta\" dir=\"ltr\" data-placeholder=\"Translation\"><span class=\"Y2IQFc\" lang=\"en\">The <strong>total length<\/strong> of the bridge superstructure is <strong>172 m<\/strong>, and the <strong>width of one track<\/strong>, for each of the two traffic directions is <strong>13.40 m<\/strong>.<\/span><\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n\nFor this infrastructure bridge, <strong>Skela Industries<\/strong> handled fabrication and delivery of approx. <strong>1200 tons<\/strong> of structural steel (metal half-boxes and accessories), the metal structure of the deck being delivered in oversized sections that were assembled on site, by welding. The material of choise was weathering steel (Corten type material).\n\n<!-- \/wp:paragraph -->\n\n<!-- wp:image {\"id\":4021,\"sizeSlug\":\"large\"} -->\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" class=\"wp-image-4021\" src=\"https:\/\/www.skela.ro\/wp-content\/uploads\/2020\/10\/Pod-metalic-infrastructura-Centura-Bacau-Skela-2-wm-1024x683.jpg\" alt=\"Skela Industries - transport si livrare structura metalica tablier pod infrastructura rutiera Centura Bacau A7 (Autostrada Moldovei)\" srcset=\"https:\/\/www.skela.ro\/wp-content\/uploads\/2020\/10\/Pod-metalic-infrastructura-Centura-Bacau-Skela-2-wm-1024x683.jpg 1024w, https:\/\/www.skela.ro\/wp-content\/uploads\/2020\/10\/Pod-metalic-infrastructura-Centura-Bacau-Skela-2-wm-300x200.jpg 300w, https:\/\/www.skela.ro\/wp-content\/uploads\/2020\/10\/Pod-metalic-infrastructura-Centura-Bacau-Skela-2-wm-768x512.jpg 768w, https:\/\/www.skela.ro\/wp-content\/uploads\/2020\/10\/Pod-metalic-infrastructura-Centura-Bacau-Skela-2-wm.jpg 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/>\n\n<figcaption>Oversized transport and delivery of steel semi-boxes for highway bridge deck<\/figcaption><\/figure>\n<!-- \/wp:image -->\n\n<!-- wp:image {\"id\":4022,\"sizeSlug\":\"large\"} -->\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" class=\"wp-image-4022\" src=\"https:\/\/www.skela.ro\/wp-content\/uploads\/2020\/10\/Pod-metalic-infrastructura-Centura-Bacau-Skela-3-wm-1024x683.jpg\" alt=\"Fabrica Skela Industries - structura metalica tablier pod rutier Centura Bacau A7 (Autostrada Moldovei)\" srcset=\"https:\/\/www.skela.ro\/wp-content\/uploads\/2020\/10\/Pod-metalic-infrastructura-Centura-Bacau-Skela-3-wm-1024x683.jpg 1024w, https:\/\/www.skela.ro\/wp-content\/uploads\/2020\/10\/Pod-metalic-infrastructura-Centura-Bacau-Skela-3-wm-300x200.jpg 300w, https:\/\/www.skela.ro\/wp-content\/uploads\/2020\/10\/Pod-metalic-infrastructura-Centura-Bacau-Skela-3-wm-768x512.jpg 768w, https:\/\/www.skela.ro\/wp-content\/uploads\/2020\/10\/Pod-metalic-infrastructura-Centura-Bacau-Skela-3-wm.jpg 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/>\n\n<figcaption>Steel haf-box for mixed deck of infrastructure bridge<\/figcaption><\/figure>\n<!-- \/wp:image -->\n\n<!-- wp:paragraph -->\n\n<strong>Skela Industries &#8211; your reliable Romanian partner<\/strong> in the design, re-design, fabrication, transport and installation of <strong>structural steel<\/strong> &#8211; metal structures, bridges and walkways, industrial halls, heavy metal constructions, any type of metal halls, totems and advertising unipoles, agricultural halls, domes and large metal awnings, photovoltaic panel support structures, hangars on the metal structure, metal structures for greenhouses, gas stations, etc.\n\n<!-- \/wp:paragraph -->\n\n<!-- wp:heading {\"level\":1} -->\n\n&nbsp;","protected":false},"excerpt":{"rendered":"<p>Metal deck structure for infrastructure bridge Skela Industries produced and delivered the metal structure of the road infrastructure bridge deck over the Letea escape channel (Rusi Ciutea). This road infrastructure bridge with mixed deck is part of the Bacau Beltway (bypass of the city), which is part of the A7 Moldova Highway (Ploiesti &#8211; Bacau&hellip;<\/p>\n","protected":false},"author":9,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[59,57,58],"class_list":["post-4303","post","type-post","status-publish","format-standard","hentry","category-noutati","tag-metal-bridge-deck","tag-steel-bridges-romania","tag-structural-steel-bridge-apron","category-7","description-off"],"_links":{"self":[{"href":"https:\/\/www.skela.ro\/en\/wp-json\/wp\/v2\/posts\/4303"}],"collection":[{"href":"https:\/\/www.skela.ro\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.skela.ro\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.skela.ro\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.skela.ro\/en\/wp-json\/wp\/v2\/comments?post=4303"}],"version-history":[{"count":27,"href":"https:\/\/www.skela.ro\/en\/wp-json\/wp\/v2\/posts\/4303\/revisions"}],"predecessor-version":[{"id":4837,"href":"https:\/\/www.skela.ro\/en\/wp-json\/wp\/v2\/posts\/4303\/revisions\/4837"}],"wp:attachment":[{"href":"https:\/\/www.skela.ro\/en\/wp-json\/wp\/v2\/media?parent=4303"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.skela.ro\/en\/wp-json\/wp\/v2\/categories?post=4303"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.skela.ro\/en\/wp-json\/wp\/v2\/tags?post=4303"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}