Located near the A2 Bucharest-Constanța highway, this 5 MWp photovoltaic park represents a major project in Romania’s renewable energy sector. The project was completed in 2013 and involved the design, fabrication, and installation of support structures for the photovoltaic panels.
Construction description:
The support structures were designed to hold 3 photovoltaic panels arranged in portrait format, optimizing space usage and solar energy capture.
Purpose of the works:
The design, fabrication, and on-site installation of the support structures for the photovoltaic panels were successfully completed, ensuring long-term stability and efficiency.
Main challenges:
The primary challenges of the project included adapting the support structures to the terrain conditions and ensuring rapid and efficient installation in accordance with local and environmental requirements.
Completion date: 2013