{"id":126,"date":"2013-02-24T12:38:42","date_gmt":"2013-02-24T12:38:42","guid":{"rendered":"http:\/\/skela.ro\/?p=126"},"modified":"2024-10-21T09:08:36","modified_gmt":"2024-10-21T09:08:36","slug":"izen-energy-system-nv","status":"publish","type":"post","link":"https:\/\/www.skela.ro\/ro\/izen-energy-system-nv\/","title":{"rendered":"Photovoltaic park with 5 MWp capacity"},"content":{"rendered":"\n<p>Located near the A2 Bucharest-Constan\u021ba highway, this 5 MWp photovoltaic park represents a major project in Romania\u2019s renewable energy sector. The project was completed in 2013 and involved the design, fabrication, and installation of support structures for the photovoltaic panels.<\/p>\n\n\n\n<p>Construction description:<br>The support structures were designed to hold 3 photovoltaic panels arranged in portrait format, optimizing space usage and solar energy capture.<\/p>\n\n\n\n<p>Purpose of the works:<br>The design, fabrication, and on-site installation of the support structures for the photovoltaic panels were successfully completed, ensuring long-term stability and efficiency.<\/p>\n\n\n\n<p>Main challenges:<br>The primary challenges of the project included adapting the support structures to the terrain conditions and ensuring rapid and efficient installation in accordance with local and environmental requirements.<\/p>\n\n\n\n<p>Completion date: 2013<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Located near the A2 Bucharest-Constan\u021ba highway, this 5 MWp photovoltaic park represents a major project in Romania\u2019s renewable energy sector. The project was completed in 2013 and involved the design, fabrication, and installation of support structures for the photovoltaic panels.<\/p>\n","protected":false},"author":9,"featured_media":129,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5,8],"tags":[],"class_list":["post-126","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy-line","category-lucrari-de-referinta-p","category-5","category-8","description-off"],"_links":{"self":[{"href":"https:\/\/www.skela.ro\/ro\/wp-json\/wp\/v2\/posts\/126"}],"collection":[{"href":"https:\/\/www.skela.ro\/ro\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.skela.ro\/ro\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.skela.ro\/ro\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.skela.ro\/ro\/wp-json\/wp\/v2\/comments?post=126"}],"version-history":[{"count":13,"href":"https:\/\/www.skela.ro\/ro\/wp-json\/wp\/v2\/posts\/126\/revisions"}],"predecessor-version":[{"id":4849,"href":"https:\/\/www.skela.ro\/ro\/wp-json\/wp\/v2\/posts\/126\/revisions\/4849"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.skela.ro\/ro\/wp-json\/wp\/v2\/media\/129"}],"wp:attachment":[{"href":"https:\/\/www.skela.ro\/ro\/wp-json\/wp\/v2\/media?parent=126"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.skela.ro\/ro\/wp-json\/wp\/v2\/categories?post=126"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.skela.ro\/ro\/wp-json\/wp\/v2\/tags?post=126"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}